SLUSCM2B October 2017 – November 2018
PRODUCTION DATA.
Refer to the PDF data sheet for device specific package drawings
LED Status: connect a 1.5-kΩ resistor in series with a LED between OUT and CHG to indicate charging status. Connect a 1.5-kΩ resistor in series with a LED between OUT and PGOOD to indicate when a valid input source is connected.
Processor Monitoring Status: connect a pullup resistor (on the order of 100 kΩ) between the processor’s power rail and CHG and PGOOD