SLUSCU1A May 2017 – May 2018
PRODUCTION DATA.
When an input source plugs in, the charger checks the input source voltage to turn on LDO and all the bias circuits. It sets the input current limit before the converter starts.
The power-up sequence from DC source is as follows: