SBASAS1A November 2023 – March 2024 DAC39RF12 , DAC39RFS12
PRODUCTION DATA
At power up, ramp up the power supplies in the following order:
Ramp 1.8V supplies, including the bias voltage for DACOUTA+/- and DACOUTB+/-
Ramp -1.8V supplies
Ramp 1.0V supplies
Use the reverse order for rampdown.
Ramp down 1.0V supplies
Ramp down -1.8V supplies
Ramp down 1.8V supplies, including the bias voltage for DACOUTA+/- and DACOUTB+/-