Note 1: ±8.75-V delta, ∆V,
shall be considered the max operating delta between VBIAS and
VOFFSET. Customers may find that the most reliable way to ensure this is to
power VOFFSET prior to VBIAS during power up and to remove
VBIAS prior to VOFFSET during power down.
Figure 9-1 Power Supply Sequencing Requirements (Power Up and Power Down)