9 Revision History
Changes from Revision B (February 2024) to Revision C (August 2024)
- Updated the clock frequency, DCLK, for the high-speed interface in Recommended Operating Conditions
Go
- Updated the clock frequency, DCLK, for the high-speed interface in Timing Requirements
Go
Changes from Revision A (February 2023) to Revision B (February 2024)
- Changed the document From: Advance Information To: Production DataGo
- Clarified test pad functions in Table 4-2
Go
- Updated ESD Ratings; Updated Current and Power Consumption in Electrical
Characteristics
Go