DLPS029F April 2013 – May 2019 DLPC350
PRODUCTION DATA.
The DLPC350 controller requires a minimum horizontal and vertical blanking for both Port 1 and Port 2. These parameters indicate the time allocated to retrace the signal at the end of each line and field of a display. For the related parameter definitions, see Video Timing Parameter Definitions.