SPRSP62A december 2022 – august 2023 TDA4AL-Q1 , TDA4VE-Q1 , TDA4VL-Q1
PRODUCTION DATA
Refer to the PDF data sheet for device specific package drawings
NO. | MIN | MAX | UNIT | ||
---|---|---|---|---|---|
RMII1 | tc(ref_clk) | Cycle time, RMII[x]_REF_CLK | 19.999 | 20 | ns |
RMII2 | tw(ref_clkH) | Pulse Duration, RMII[x]_REF_CLK high | 7 | 13 | ns |
RMII3 | tw(ref_clkL) | Pulse Duration, RMII[x]_REF_CLK low | 7 | 13 | ns |