SLLSEX2F December 2016 – April 2024 TDP158
PRODUCTION DATA
TDP158 starts to operate after the OE signal is properly set after power up timing is complete. See Figure 7-3 and Table 7-1. Keeping OE low until VDD and VCC becomes stable avoids any timing requirements as shown in Figure 7-3.
PARAMETER | DESCRIPTION | MIN | TYP | MAX | UNIT |
---|---|---|---|---|---|
td1 | VCC stable before VDD | 0 | 200 | µs | |
td1 | VDD and VCC stable before OE de-assertion | 100 | µs | ||
VDD(ramp) | VDD supply ramp up requirements | 0.002 | 100 | ms | |
VCC(ramp) | VCC supply ramp up requirements | 0.002 | 100 | ms |