10 Revision History
Changes from Revision A (December 2023) to Revision B (September 2024)
- Changed TLV2365-Q1 device status from preview to
advanced information (preview with samples)Go
- Added TLV2365-Q1 advanced information DGK
packageGo
- Added Thermal Information for DGK packageGo
Changes from Revision * (June 2023) to Revision A (December 2023)
- Changed data sheet status from advanced mix to
production mixGo
- Changed status of TLV365-Q1 in DBV package from
advanced information (preview) to production data
(active)Go