SBVS383A December 2019 – March 2020 TLV752
PRODUCTION DATA.
During normal operation, the input current to the LDO is approximately equal to the output current of the LDO. During startup, the input current is higher as a result of the inrush current charging the output capacitor. Use Equation 6 to calculate the current through the input.
where