SNVSCG1 july   2023 TPS38700S-Q1

PRODUCTION DATA  

  1.   1
  2. Features
  3. Applications
  4. Description
  5. Revision History
  6. Device Comparison
  7. Pin Configuration and Functions
  8. Specifications
    1. 7.1 Absolute Maximum Ratings
    2. 7.2 ESD Ratings
    3. 7.3 Recommended Operating Conditions
    4. 7.4 Thermal Information
    5. 7.5 Electrical Characteristics
    6. 7.6 Timing Requirements
    7. 7.7 Typical Characteristics
  9. Detailed Description
    1. 8.1 Overview
    2. 8.2 Functional Block Diagram
    3. 8.3 Feature Description
      1. 8.3.1 Device State Diagram
      2. 8.3.2 Sync Functionality
      3. 8.3.3 Transitioning Sequences
        1. 8.3.3.1 Power Up
        2. 8.3.3.2 Power Down
        3. 8.3.3.3 Emergency Power Down
      4. 8.3.4 BACKUP State
      5. 8.3.5 Thermal Shutdown (TSD) State
      6. 8.3.6 I2C
        1. 8.3.6.1 I2C
    4. 8.4 Register Map Table
      1. 8.4.1 Register Descriptions
  10. Application and Implementation
    1. 9.1 Application Information
    2. 9.2 Typical Application
      1. 9.2.1 Automotive Multichannel Sequencer and Monitor
      2. 9.2.2 Design Requirements
      3. 9.2.3 Detailed Design Procedure
      4. 9.2.4 Test Implementation
      5. 9.2.5 Application Curves
  11. 10Power Supply Recommendations
    1. 10.1 Power Supply Guidelines
  12. 11Layout
    1. 11.1 Layout Guidelines
    2. 11.2 Layout Example
  13. 12Device and Documentation Support
    1. 12.1 Device Nomenclature
    2. 12.2 Receiving Notification of Documentation Updates
    3. 12.3 Support Resources
    4. 12.4 Trademarks
    5. 12.5 Electrostatic Discharge Caution
    6. 12.6 Glossary
  14.   Mechanical, Packaging, and Orderable Information

Package Options

Mechanical Data (Package|Pins)
Thermal pad, mechanical data (Package|Pins)
Orderable Information

Power Up

When ACT is driven high, the first EN signal is turned on by TPS38700S-Q1. Then, the MON voltage rises and triggers TPS389006-Q1 to send the first SYNC signal which causes TPS38700S-Q1 to turn on the second EN voltage. This process repeats until all Enable voltages turn on. After the final EN signal is turned on, NRST deactivates after the RST_DLY time. A successful power up sequence is shown in Figure 8-5 using the circuit shown in Figure 9-12. Note that the TPS389006-Q1 defaults to using UV thresholds for sending the SYNC pulse when sequencing up.

GUID-20230614-SS0I-24P9-1CCX-HJFXZRVQ5RFP-low.svgFigure 8-4 TPS38700S Power Up with SYNC