SBVS446A August 2023 – January 2024 TPS7A53B
PRODUCTION DATA
Soft-start directly controls the output start-up time and indirectly controls the output current during start-up (inrush current).
As shown in Figure 6-2, the external capacitor at the NR/SS pin (CNR/SS) sets the output start-up time by setting the rise time of the internal reference (VNR/SS).