SLUSCU6C August 2017 – January 2020 UCC256301
PRODUCTION DATA.
The total secondary side RMS load current is the current referred from the primary side current (Ioe) to the secondary side.
In this design, the transformer’s secondary side has a center-tapped configuration. The current of each secondary transformer winding is calculated by:
The corresponding half-wave average current is: