JAJSS68A November 2023 – June 2024 AM625SIP
PRODUCTION DATA
デバイスごとのパッケージ図は、PDF版データシートをご参照ください。
This section describes the power supply requirements to ensure proper device operation.
All power balls must be supplied with the voltages specified in the Recommended Operating Conditions section.