JAJSFJ5I March 2014 – August 2024 BQ2970 , BQ2971 , BQ2972 , BQ2973
PRODUCTION DATA
Orange Line (Channel 1) = Power Up Ramp on BAT Pin | ||
Turquoise Line (Channel 2) = DOUT Gate Drive Output | ||
DOUT goes from low to high when UVP Recovery = UVP Set Threshold +100mV |
Orange Line (Channel 1) = Power Up Ramp on BAT pin | ||
Turquoise Line (Channel 2) = DOUT Gate Drive Output | ||
Orange Line (Channel 1) = Power Up Ramp on BAT Pin | ||
Turquoise Line (Channel 2) = COUT Gate Drive Output | ||
COUT goes from high to low when OVP threshold = OVP set Threshold + set delay time |
Orange Line (Channel 1) = Power Down Ramp on BAT Pin | ||
Turquoise Line (Channel 2) = DOUT Date Drive Output | ||
DOUT goes from high to low when UVP threshold = UVP set Threshold + set delay time |
Orange Line (Channel 1) = Power Up Ramp on BAT Pin | ||
Turquoise Line (Channel 2) = COUT Gate Drive Output | ||
Orange Line (Channel 1) = Decrease Voltage on BAT Pin | ||
Turquoise Line (Channel 2) = COUT Gate Drive Output | ||
COUT goes from low to high when OVP Recovery = OVP Set Threshold –100mV |