JAJSQG3B march 2022 – may 2023 TPS389006-Q1
PRODUCTION DATA
Six different voltage rails supplied by DC/DC converters need to be properly monitored in this design. All detected failures in sequencing should be reported via an external hardware interrupt signal. All detected failures should be logged in internal registers and be accessible to an external processor via I2C.