To operate the EVM using the onboard
clocking solution, do the following:
- Remove the shunt on LMX_CE jumper
J6
- Move C7 to C277
- Move C6 to C278
- Install FB28 with MuRata
BLM18AG121TN1D or equivalent. This is located on the bottom of the board under
Y2.
- Instructions on GUI settings are
provided in Appendix B regarding operating in this mode.