SBVU070B
September 2021 – August 2022
TPS7A94
Abstract
Trademarks
1
Introduction
1.1
Before You Begin
2
EVM Setup
2.1
Inputs/Outputs Connectors and Jumper Descriptions
2.1.1
J1 – IN
2.1.2
J2 – OUT
2.1.3
J3
2.1.4
TP1 – IN
2.1.5
TP2 – PG
2.1.6
TP3 – SNS
2.1.7
TP4 – PG_FB
2.1.8
TP5 – OUT
2.1.9
TP6 – EN
2.1.10
TP7 – GND
2.1.11
TP8 – GND
2.2
Soldering Guidelines
2.3
Equipment Connections
3
Operation
4
PCB Layout
5
Schematic
6
Bill of Materials
7
Revision History
2.1.8
TP5 – OUT
Regulated output test-point connection.