SBVU077
October 2022
Abstract
Trademarks
1
Introduction
1.1
Before You Begin
2
Schematic
3
EVM Setup
3.1
Jumper Connections
3.1.1
J11-14: Output Voltage Select
3.2
Test Points
3.3
Soldering Guidelines
4
Equipment Connection and Operation
5
PCB Layout
6
Bill of Materials (BOM)
3.1
Jumper Connections