SBVU077
October 2022
Abstract
Trademarks
1
Introduction
1.1
Before You Begin
2
Schematic
3
EVM Setup
3.1
Jumper Connections
3.1.1
J11-14: Output Voltage Select
3.2
Test Points
3.3
Soldering Guidelines
4
Equipment Connection and Operation
5
PCB Layout
6
Bill of Materials (BOM)
5
PCB Layout
Figure 5-1
through
Figure 5-4
depict the layout of the TPS715EVM-074.
Figure 5-1
TPS715EVM-074 Top Layer Routing
Figure 5-3
TPS715EVM-074 Internal Layer 2 Routing
Figure 5-2
TPS715EVM-074 Internal Layer 1 Routing
Figure 5-4
TPS715EVM-074 Bottom Layer Routing