SBVU085
December 2024
1
Description
Features
Applications
5
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
Hardware
2.1
Power Requirements
2.1.1
EVM Connections
2.1.2
Test Equipment
2.1.3
Recommended Test Setup
2.1.3.1
Input Connections
2.1.3.2
Output Connections
2.1.4
Test Procedure
2.1.4.1
TPS7N53 LDO Operation
3
Implementation Results
3.1
Performance Data and Results
4
Hardware Design Files
4.1
Schematics
4.2
PCB Layouts
4.3
Bill of Materials (BOM)
5
Compliance Information
5.1
Compliance and Certifications
6
Additional Information
6.1
Trademarks
7
Related Documentation
7.1
Supplemental Content
2.1.3.2
Output Connections
Connect electronic load to V
OUT
connection. Set the load to constant-resistance mode or constant-current mode at 10mA after applying V
IN
and V
DD
.
Connect voltmeter 2 at V
OUT
and GND connections to measure the output voltage.
Connect ammeter 2 to measure the output current.