SLUUB41A May 2014 – October 2021 BQ76920 , BQ76930 , BQ76940
Yes, the AFE requires control by the host to recover the system from the fault. The host must turn on the FET controls after appropriate recovery delay or conditions. Clearing the status is not sufficient.