Use the following list to set up the
EVM testing equipment. Refer to Figure 2-1 for the test setup connections to the EVM:
- Review the EVM connections in
Table 1-2.
- Set PS#1 for 5.0-V, 3-A current
limit and then turn off the supply. Connect PS#1 to J1 (VIN1 and PGND).
- Connect a voltage meter across
TP21 (VBUS) and TP47 (PGND) to measure the input voltage as seen from the
VBUS pins of the charger.
- Connect a voltage meter across
TP1 and TP2 (I_VAC1_SENSE) to measure the input current into the VBUS pins
through the VIN1 path. Alternatively, you may connect a current meter
between PS1 and J1.
- Set Load #1 to constant voltage
mode, capable of sinking (for example, compliance) at least 3 A, and output
to 5.0 V, and then disable load. Connect Load #1 to J5 (BATTERY and
PGND).
- Connect a voltage meter across
TP27 (BAT) and TP46 (PGND) to measure the battery voltage as seen from the
BAT pins of the charger.
- Connect a voltage meter across
TP17 and TP18 (I_BAT_SENSE) to measure the battery charge current out of and
discharge current into BAT pins. Alternatively, you may connect a current
meter between Load #1 and J5.
- Connect a voltage meter across
TP26 (SYS) and TP48 (PGND) to measure the system voltage as seen from the
SYS pins of the charger.
- Install shunts as shown in
Table 1-3.