SLUUC73A March   2020  – December 2023 BQ25616

 

  1.   1
  2.   BQ25616, BQ25616J BMS026 Evaluation Module
  3.   Trademarks
  4. 1Introduction
    1. 1.1 EVM Features
    2. 1.2 I/O Descriptions
  5. 2Test Summary
    1. 2.1 Equipment
    2. 2.2 Equipment Setup
    3. 2.3 Test Procedure
      1. 2.3.1 Initial Settings
      2. 2.3.2 Charge Mode Verification
      3. 2.3.3 Boost Mode Verification
      4. 2.3.4 Helpful Tips
  6. 3PCB Layout Guideline
  7. 4Board Layout
  8. 5Schematic
  9. 6Bill of Materials
  10. 7Revision History

Boost Mode Verification

  1. Turn off and disconnect PS1.
  2. Set Load #1 to 3.7V and 2A current limit.
    Note:

    If Load #1 connected from BATTERY-J5(2) to PGND-J5(1) is not a four quadrant supply, remove Load #1 and use PS1 (disconnected previously), set to 3.7V, 2A current limit and connect across BATTERY-J5(2) to PGND-J5(1).

  3. Remove shunt JP20 to enable boost mode.
  4. Connect Load #2 across VAC-J1(2) and GND-J1(1).
    • Measure → VBUS (VBUS-TP7 and PGND-TP25) = 5.0V±0.2V
  5. Turn off and disconnect power supply.
  6. Remove Load #2 from connection.
  7. Reconnect shunt JP20.