Initial Settings

Use the following steps to enable the EVM test setup.

  1. Make sure the steps in Section 2.2 and Section 2.3 have been followed.
  2. Turn on PS1 and Load #1:
    • Measure → VVAC1-GND(TP1 and TP37) = 8.3 ± 0.2 V
    • Measure → VVBUS_M-GND(TP2 and TP37) = 0 ± 0.5 V
    • Measure → VVOUT_M-GND(TP5 and TP37) = 4 ± 0.2 V