Use the following steps to enable the EVM test
setup.
- Make sure the steps in Section 2.2 and Section 2.3 have been followed.
- Turn on PS1 and Load #1:
- Measure → VVAC1-GND(TP1 and
TP37) = 8.3 ± 0.2 V
- Measure → VVBUS_M-GND(TP2 and
TP37) = 0 ± 0.5 V
- Measure → VVOUT_M-GND(TP5 and
TP37) = 4 ± 0.2 V