SLVU865A March   2013  – May 2021 TPS65282

 

  1. 1INTRODUCTION
  2. 2BACKGROUND
  3. 3BOARD LAYOUT
  4. 4BENCH TEST SETUP CONDITIONS
    1. 4.1 Headers Description and Jumper Placement
    2. 4.2 Jumpers and Switches
  5. 5POWER-UP PROCEDURE
  6. 6SCHEMATIC AND BILL OF MATERIALS
  7. 7Revision History

POWER-UP PROCEDURE

  1. Apply 4.5 V - 18 V to JP7.
  2. Toggle JP1 to enable VOUT1.
  3. Toggle JP6 and JP5 to enable switch 1 and switch 2.
  4. Apply load to the output connectors.