SLVUCH7A september 2022 – june 2023 TPS25990
In this user's guide, the test procedure is described for TPS25990 eFuse. Make sure the evaluation board has default jumper settings as shown in Table 5-1.
J2 |
J3 |
J4 |
J5 |
J6 |
J7 |
J8 |
J9 |
---|---|---|---|---|---|---|---|
1-2 |
5-6 |
1-2 |
1-2 |
1-2 |
1-2 |
1-2 |
1-2 |
Follow these instructions before starting any test and repeat again before moving to the next test:
Enable the power supply output so that the EVM gets the input power supply.