SNOK002 February   2021 LMP2012QML-SP

 

  1.   Trademarks
  2. 1Overview
  3. 2Test Procedures
  4. 3Facility
  5. 4Results
  6.   A Appendix A: Test Results

Test Procedures

The LMP2012QMLV-SP was electrically pre-tested using the production automated test equipment program.

General test procedures were IAW MIL-STD-883, Method 1017 for Neutron Irradiation of LMP2012QMLV-SP.

Table 2-1 Neutron Irradiation Conditions
GroupSample QtyNeutron Fluence (n/cm2)Bias
A51.0 × 1011Unbiased
B53.2 × 1011Unbiased
C51.0 × 1012Unbiased