SNVU821 November 2023 TPS92642-Q1
The LEDs are to be connected, as shown in Figure 4-2, where the anode of the LEDs are to be connected to VOUT+ test points or through J1 or VOUT+ (TP1) and the cathode of the LEDs to GND (TP7). The input power supply can be connected by header J2 using a harness or by VIN (TP2) and GND (TP7) using test cables.