SNVU872A
September 2023 – March 2024
LM70880-Q1
1
Description
Features
Applications
5
1
Evaluation Module Overview
1.1
Introduction
1.2
Kit Contents
1.3
Specification
1.4
Device Information
2
Hardware
2.1
Test Setup and Procedure
2.1.1
EVM Connections
2.1.2
Test Equipment
2.1.3
Recommended Test Setup
2.1.3.1
Input Connections
2.1.3.2
Output Connections
2.1.4
Test Procedure
2.1.4.1
Line and Load Regulation, Efficiency
3
Implementation Results
3.1
Performance Data and Results
3.1.1
EVM Characteristics
3.1.2
Conversion Efficiency
3.1.3
Operating Waveforms
3.1.3.1
Switching
3.1.3.2
Load Transient Response
3.1.3.3
Line Transient Response
3.1.3.4
Start-Up and Shutdown With EN
3.1.3.5
Start-Up with VIN
3.1.4
Bode Plot
3.1.5
CISPR 25 EMI Performance
3.1.6
Thermal Performance
4
Hardware Design Files
4.1
Schematic
4.2
PCB Layout
4.2.1
Component Drawings
4.2.2
Multi-Layer Stackup
4.3
Bill of Materials
5
Compliance Information
5.1
Compliance and Certifications
6
Related Documentation
6.1
Supplemental Content
6.1.1
Development Support
6.1.2
PCB Layout Resources
6.1.3
Thermal Design Resources
7
Additional Information
7.1
Trademarks
8
Revision History
2.1.3.2
Output Connections
Connect electronic load to VOUT connection. Set the load to constant-resistance mode or constant-current mode at 0A before applying input voltage.
Connect voltmeter 2 at VOUT and GND connections to measure the output voltage.
Connect ammeter 2 to measure the output current.