SNVU907A July 2024 – August 2024 LM5137-Q1 , LM5137F-Q1
Referencing the EVM connections described in Table 2-1, Figure 2-1 shows the recommended test setup to evaluate the LM25137F-Q1-EVM5D3. Working at an ESD-protected workstation, verify that any wrist straps, boot straps or mats are connected and referencing the user to earth ground before handling the EVM.
LABEL | DESCRIPTION |
---|---|
VIN | Positive input voltage power and sense connection |
GND | Negative input voltage power and sense connection |
VOUT1 | Channel 1 positive output voltage power and sense connection |
VOUT2 | Channel 2 positive output voltage power and sense connection |
GND | Negative output voltage power and sense connection |
LABEL | DESCRIPTION |
---|---|
PGND | GND connection |
EN1, EN2 | ENABLE inputs – tie to GND to disable the respective channel |
PG1, PG2 | Power Good outputs |
FAULT1, FAULT2 | FAULT outputs |
SYNCOUT | Synchronization output |
VCC | Bias rail connection |
PFM/SYNCIN | Synchronization input |
IMON1, IMON2 | Current monitor outputs |
Refer to the LM5137-Q1 data sheet, quickstart calculator and WEBENCH® Power Designer for additional guidance pertaining to component selection and controller operation.