SPRAD13A May   2022  – December 2024 AM623 , AM625

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. Introduction
  5. Via Channel Arrays
  6. Width/Spacing Proposal for Escapes
  7. Stackup
  8. Via Sharing
  9. Floorplan Component Placement
  10. Critical Interfaces Impact Placement
  11. Routing Priority
  12. SerDes Interfaces
  13. 10DDR Interfaces
  14. 11Power Decoupling
  15. 12Route Lowest Priority Interfaces Last
  16. 13Summary
  17. 14Revision History

Route Lowest Priority Interfaces Last

When the length matching and simulations have been completed for the highest priority interfaces and the Power Distribution Network (PDN) analysis has been completed, then the layout can continue with the medium, then the lower priority interfaces.