SPRUIS8A january   2020  – august 2023 DRA829J , DRA829J-Q1 , DRA829V , DRA829V-Q1 , TDA4VM , TDA4VM-Q1

 

  1.   1
  2.   Trademarks
  3. 1Introduction
  4. 2Step 1: Setup EVM and Expansion Card Hardware
    1. 2.1 Attaching the SOM to the Common Processor Board
    2. 2.2 Attaching an Optional Expansion Card
  5. 3Step 2: Experiencing the Out Of Box (OOB) Demonstration to Ensure the EVM Hardware is Functional
  6. 4Step 3: Download and Install Processor SDK (softweare development kit)
  7. 5Step 4: Project 0, Your First ‘Hello World’ project to Ensure Interoperability of EVM and Software
  8.   Additional Resources
  9.   A Installing the Automotive Gateway/Ethernet Switch/Industrial Expansion Card Onto the Common Processor Board
  10.   B Installing the Infotainment Expansion Board Onto the Common Processor Board
  11.   Revision History

Revision History

Changes from Revision * (January 2020) to Revision A (August 2023)

  • Updated the numbering format for tables, figures and cross-references throughout the document.Go
  • Updated Section 5.Go