SPRUJ81 February 2023 AM62A3 , AM62A3-Q1 , AM62A7 , AM62A7-Q1
When the length matching and simulations for high speed interfaces and DDR have been completed for the highest priority interfaces and the Power Distribution Network (PDN) analysis has been completed, then the layout can continue with the medium and then the lower priority interfaces.