TIDT236 March   2022 TPS7H1101A-SP

 

  1.   Description
  2. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Dimensions
  3. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
  4. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence

Required Equipment

  • Power supplies (one to provide main converter power, the other to provide the enable signal)
  • Electronic load (with very low operating voltage, that is, 0-V rated)
  • Digital multimeters
  • Oscilloscope
  • Auxiliary power supply or function generator (for providing signal that controls the output voltage)