Figure 3-2 shows the hardware blocks. Complete the following test setup steps before
beginning each build level test:
- Connect emulator to J9
- Connect AC power supply to J1, J2, and J3, set to
0V output
- Connect DC load to J4 and J8, set to 530Ω
- Connect J9 to a laptop with a UART to USB
adapter
- Connect 15V, 1A DC adapter to J10