SBVU059A December   2019  – September 2023

 

  1.   1
  2.   2
  3.   Trademarks
  4. 1Introduction
    1. 1.1 Before You Begin
  5. 2EVM Setup
    1. 2.1 Input/Output Connectors and Jumper Descriptions
      1. 2.1.1  J1 – VIN
      2. 2.1.2  J2 – VIN
      3. 2.1.3  J3 – EN
      4. 2.1.4  J4 – VOUT
      5. 2.1.5  J5 – PG
      6. 2.1.6  J6 – VOUT
      7. 2.1.7  J7 – BIAS
      8. 2.1.8  J8 – GND
      9. 2.1.9  J9 – GND
      10. 2.1.10 J10 -- GND
      11. 2.1.11 J11
      12. 2.1.12 J12
      13. 2.1.13 TP1 – VIN
      14. 2.1.14 TP2 – VEN
      15. 2.1.15 TP3 – PG
      16. 2.1.16 TP4 – VOUT
      17. 2.1.17 TP5 – VBIAS
      18. 2.1.18 TP6 – GND
      19. 2.1.19 TP7 – GND
      20. 2.1.20 TP8 – GND
      21. 2.1.21 TP9 – GND
    2. 2.2 Soldering Guidelines
    3. 2.3 Equipment Connection
  6. 3Operation
  7. 4PCB Layout
  8. 5Schematic
  9. 6Bill of Materials
  10. 7Revision History

Operation

Use the following steps to operate the equipment:

  1. Turn on the power supplies.
  2. Enable the output by jumping J3 (the EN pin) to VIN.
  3. Vary the respective load and input voltage as necessary for test purposes.