SBVU076 April   2022

 

  1.   1
  2.   2
  3.   3
    1.     4
      1.      5
      2.      6
      3.      7
      4.      8
    2.     9
      1.      10
      2.      11
      3.      12
      4.      13
      5.      14
      6.      15
      7.      16
      8.      17
    3.     18
    4.     19
  4.   20
  5.   21
  6.   22

VDD and GND

VDD and GND are the connection terminals for the input supply of the load transient circuit. The VDD terminal is the positive connection, and the GND terminal is the negative (that is, ground) connection.