SBVU076 April   2022

 

  1.   1
  2.   2
  3.   3
    1.     4
      1.      5
      2.      6
      3.      7
      4.      8
    2.     9
      1.      10
      2.      11
      3.      12
      4.      13
      5.      14
      6.      15
      7.      16
      8.      17
    3.     18
    4.     19
  4.   20
  5.   21
  6.   22

Setup

This section describes the jumpers and connectors on the EVM, and how to properly connect, set up, and use the TPS7A74EVM-068. Section 2.1 and Section 2.3 describe the test setup and operation for the TPS7A74 LDO. Section 2.2 and Section 2.4 describe the test setup and operation of the optional load transient circuit.