SLAA638A august 2014 – may 2023 MSP430I2040 , MSP430I2041
Now the setup and configuration of hardware and software is completed. The operation of the EVM and the PC software tool is discussed here. Before proceeding, make sure the steps described in the previous section are completed and that power is applied to the EVM, and that line voltage to the load is applied.