SLAA843A August   2018  – March 2019 MSP430FR2512 , MSP430FR2512 , MSP430FR2522 , MSP430FR2522 , MSP430FR2532 , MSP430FR2532 , MSP430FR2533 , MSP430FR2533 , MSP430FR2632 , MSP430FR2632 , MSP430FR2633 , MSP430FR2633

 

  1.   Sensitivity, SNR, and design margin in capacitive touch applications
    1.     Trademarks
    2. 1 Overview
      1. 1.1 Design Objectives
        1. 1.1.1 Reliability
        2. 1.1.2 Robustness
      2. 1.2 The Designer's Dilemma
    3. 2 Recommended Actions for Developers
      1. 2.1 Run SNR and Design Margin Tests
    4. 3 Terminology
      1. 3.1 Signal (S)
      2. 3.2 Noise (N)
      3. 3.3 Threshold (Sensitivity) (Th)
      4. 3.4 Design Margin
        1. 3.4.1 False Detection Margin (Min)
        2. 3.4.2 Detection Margin (Mout)
      5. 3.5 Signal-to-Noise Ratio (SNR)
      6. 3.6 Advice
    5. 4 CapTIvate Device Performance
      1. 4.1 Minimum Recommended Values
      2. 4.2 CapTIvate Device SNR
    6. 5 Interpreting the Results
      1. 5.1 Interpreting the Advice
      2. 5.2 Check Other Results
    7. 6 Application of Terms
      1. 6.1 Count and Percent Change Analysis With 7.5-mm Overlay, Advice = POOR
      2. 6.2 Count and Percent Change Analysis With 1.5-mm Overlay, Advice = GOOD
      3. 6.3 Count and Percent Change Analysis (1.5-mm Overlay vs 7.5-mm Overlay)
      4. 6.4 Effect of Post-Processing and Sampling Rate
    8. 7 Summary
  2.   Revision History

Design Objectives

The primary objective of a capacitive touch design engineer is to develop a system that:

  • Meets the functional needs of the application
  • Integrates well into the overall product or parent system
  • Is cost optimized
  • Is reliable
  • Is robust

Often, the designer focuses on the first three objectives the most during product development and does not focus on the last two objectives (reliability and robustness) until much of the design work is complete and the qualification phase is beginning. This document primarily focuses on the last two objectives but does not consider them as separate activities to be completed after the other objectives are met. Rather, these objectives should be assessed throughout the design and development phases.