SLAU320AJ July 2010 – May 2021
Reference function: BlowFuse_sbw
In SBW mode, the TEST/SBWTCK pin is used to apply fuse-blow voltage VPP. The required timing sequence is shown in Figure 2-19. The actual fuse programming happens in the Run-Test/Idle state of the TAP controller. After the IR_EX_BLOW instruction is shifted in through SBW, one more TMS_SLOT must be performed. Then a stable VPP must be applied to SBWTCK. Taking SBWTDIO high as soon as VPP has been settled blows the fuse. It is required that SBWTDIO is low on exit of the IR_EX_BLOW instruction shift.