SLAU821
October 2019
CAPTIVATE-EMC Getting Started Guide
Trademarks
1
Introduction
1.1
Scope
1.2
Key Features
1.3
What’s Included
2
Required Tools
3
Hardware
3.1
Functional Block Diagram
3.2
Connectors
3.3
Power Supply
3.4
Debug Connector
4
Getting Started
4.1
Setting up the Hardware
4.2
Running the Out-of-Box Demo
4.3
Using CapTIvate Design Center
5
Test Certification
6
REACH Compliance
3.2
Connectors
There are two connectors on the CAPTIVATE-EMC board:
DC power supply connector
20-pin debug connector