  9. Test Procedure
    1. 8.1 Line/Load Regulation and Efficiency Measurement Procedure
    2. 8.2 Control Loop Gain and Phase Measurement Procedure
    3. 8.3 List of Test Points
    4. 8.4 Equipment Shutdown Procedure
  10. Performance Data and Typical Characteristic Curves
  11. 10EVM Assembly Drawing and PCB layout
  12. 11List of Materials
  13. 12References
  14. 13Revision History

Equipment Shutdown Procedure

  1. Shut down the load.
  2. Shut down VIN.
  3. Shut down the fan.