SLUUAS1C October   2013  – November 2021 TPS53515

 

  1. Introduction
  2. Description
    1. 2.1 Typical Applications
    2. 2.2 Features
  3. Electrical Performance Specifications
  4. Schematic
  5. Test Setup
    1. 5.1 Test Equipment
    2. 5.2 Recommended Test Setup
  6. Configurations
    1. 6.1 Switching Frequency Selection
    2. 6.2 Mode Selection
    3. 6.3 VDD Pin Supply Selection
  7. Test Procedure
    1. 7.1 Line and Load Regulation and Efficiency Measurement Procedure
    2. 7.2 Control-Loop Gain and Phase-Measurement Procedure
    3. 7.3 List of Test Points
    4. 7.4 Equipment Shutdown
  8. EVM Assembly Drawing and PCB Layout
  9. Bill of Materials
  10. 10Revision History

Revision History

Changes from Revision B (February 2014) to Revision C (May 2021)

  • Changed user's guide titleGo
  • Updated the numbering format for tables, figures, and cross-references throughout the document. Go

Changes from Revision A (December 2013) to Revision B (February 2014)

  • Changed the test points in the Tip and Barrel Measurement for VOUT Ripple image from TPS5 and TPS7 to TPS7 and TPS9 (respectively from left to right)Go