SLUUC79A
May 2020 – February 2022
TPS51215A
1
Introduction
2
Performance Specification Summary
3
Test Setup and Results
3.1
Input/Output Connections
3.2
Start-Up Procedure
3.3
Power Up
3.4
Power Down
4
Board Layout
5
Board Profile, Schematic, List of Materials, and Reference
5.1
Board Profile
5.2
Schematic
5.3
List of Materials
5.4
Reference
6
Revision History
3.2
Start-Up Procedure
Jump the JP2 and JP4 accordingly or connect external drive signals to the TP28 and TP30.
Jump JP1 accordingly.
Apply proper DC voltage to J1 and J2. Apply J2 12 V with external power source first and then apply J1 5 V with another power source.
Jump the JP3 accordingly or connect external drive signals to TP29.
Check the output.
Apply loading to the output connectors.
Check the output again.