SLUUC79A May   2020  – February 2022 TPS51215A

 

  1. 1Introduction
  2. 2Performance Specification Summary
  3. 3Test Setup and Results
    1. 3.1 Input/Output Connections
    2. 3.2 Start-Up Procedure
    3. 3.3 Power Up
    4. 3.4 Power Down
  4. 4Board Layout
  5. 5Board Profile, Schematic, List of Materials, and Reference
    1. 5.1 Board Profile
    2. 5.2 Schematic
    3. 5.3 List of Materials
    4. 5.4 Reference
  6. 6Revision History

Board Profile

Figure 5-1 is the top view for the TPS51215AEVM.

GUID-9587ACB5-D9B3-4B7F-9D21-A4AF74B83C8D-low.gif Figure 5-1 Top View of the TPS51215AEVM

Figure 5-2 is the bottom view for the TPS51215AEVM.

GUID-79E8A3C0-6472-4F5B-84B8-9EE0F7BF076D-low.gif Figure 5-2 Bottom View of the TPS51215AEVM