SLUUCC6A September   2020  – April 2021 TPS563211

 

  1. 1Introduction
  2. 2Performance Specification Summary
  3. 3Modifications
  4. 4Test Setup
    1. 4.1 Input/Output Connections
    2. 4.2 Start-Up Procedure
  5. 5Board Layout
    1. 5.1 Layout
    2. 5.2 EVM Picture
  6. 6Schematic, List of Materials, and Reference
    1. 6.1 Schematic
    2. 6.2 List of Materials
  7. 7Reference
  8. 8Revision History

Start-Up Procedure

  1. Ensure that the jumper at J3 (Enable control) pin 1 and 2 are covered to shunt EN to GND, disabling the output.
  2. Apply appropriate VIN voltage to VI (J1-2) and GND (J1-1).
  3. Move the jumper at J3 (Enable control) pin 1 and 2 (EN and GND) to enable the output.