SLUUCC6A September   2020  – April 2021 TPS563211

 

  1. 1Introduction
  2. 2Performance Specification Summary
  3. 3Modifications
  4. 4Test Setup
    1. 4.1 Input/Output Connections
    2. 4.2 Start-Up Procedure
  5. 5Board Layout
    1. 5.1 Layout
    2. 5.2 EVM Picture
  6. 6Schematic, List of Materials, and Reference
    1. 6.1 Schematic
    2. 6.2 List of Materials
  7. 7Reference
  8. 8Revision History

Revision History

Changes from Revision * (September 2020) to Revision A (May 2021)

  • Updated user's guide titleGo